
Complete design and supply of load bearing and critical structural beam fabrication for a 50ton, 40m long construction platform used for road widening works in Melbourne Australia.
Works included complete design and build of 2 x 10 ton capacity 55 ton tractional drive capacity (up 1.5 deg incline) girder trolleys. All work including precision module 10 CNC gear cutting, electrical, and design of 38 gears 16 wheel traction drive system done in house.